Planning & Building Regulations
Navigate the complexities of UK planning and building regulations with confidence. Our expert team handles all applications, drawings, and approvals on your behalf.
Image: LINX design visual
Real Projects
See the work behind the finish — on-site, walkthroughs and start to handover.
4.9★ from 500+ reviews on Google, Houzz, Reviews.io & TrustATrader
Client Stories
Real projects, real results — straight from the people we've worked with.
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
Why LINX
Navigating planning and building regulations can be complex and time-consuming. Our expert team handles everything from initial assessments to final approvals, ensuring your project complies with all UK regulations while saving you time and stress.
Planning permission decides whether you can build; Building Regulations decide how it must be built. Most projects need the second and many need both. Our in-house architects prepare the drawings and documents each one needs, and deal with the council on your behalf.

Our services
Comprehensive services covering all aspects of planning and building regulations compliance.

From £2,000
Expert planning application services including design statements, heritage assessments, and community consultations.

From £2,000
Comprehensive building regulations drawings and compliance services ensuring your project meets all UK building standards.

LINX design visual
Assessment and certification for permitted development rights, helping you avoid planning applications where possible.

From £2,000
Detailed technical drawings including structural, M&E, and drainage designs for construction and approval.
Full transparency
From the first assessment to the final certificate, one team prepares and manages your approvals.
Typically includes
Ideal for
It depends on the project and the property. Many single-storey rear extensions and loft conversions can go ahead under permitted development, while larger extensions, new homes, flat conversions and changes of use usually need planning permission. Flats, listed buildings and conservation areas have tighter rules. We assess your property and advise on the right route.
Planning permission controls what you build (its size, appearance and use) and is decided by the council's planning department. Building Regulations control how it is built (structure, fire safety, insulation, ventilation and drainage) and are checked by Building Control. Most building work needs Building Regulations approval even when it doesn't need planning permission.
Allow 6–12 weeks (estimated) for planning permission, including preparing and submitting the application and liaising with the local authority. The drawings themselves typically take 1–4 weeks, and structural engineering and Building Regulations 1–3 weeks, depending on complexity. All timelines are indicative. Your project-specific schedule is confirmed before construction.
If your project falls under permitted development, a Lawful Development Certificate from the council confirms that it is lawful. It isn't always required, but it gives you, and any future buyer, written proof that the work didn't need planning permission.
Planning drawings and Building Regulations drawings each start from £2,000. Your quote depends on the size and complexity of the project, so book a free consultation and we will confirm the price.