Call 020 8914 7824
    CallWhatsAppGet a Quote
    Staircase with a stained-glass window in a house renovated by LINX

    Compliance

    Building Compliance in London & the South East

    Fire safety certificates and risk assessments, health and safety documentation and fire remedial works — for residential and commercial properties.

    Real Projects

    Watch Real Projects Come Together

    See the work behind the finish — on-site, walkthroughs and start to handover.

    4.9★ from 500+ reviews on Google, Houzz, Reviews.io & TrustATrader

    South Croxted Road · SE21Infill kitchen extension — from the air and on site
    Vitali Close · SW15Rear Extension — Vitali Close
    Wallington, Surrey · SM6Rear extension & full renovation
    Sunbury · BuildOn-site with the homeowner
    Colwith Road · BuildInside the build
    Woodend Road · E17Woodend Road — Extension complete
    Loft ConversionEdward — Loft conversion
    Real projectOn-site with LINX
    Real projectKitchen extension & porch — completed project
    Real projectRear extension & bathroom — completed project
    East HorsleyHome ExtensionView
    Arlington SquareFull RenovationView
    SudbourneLoft ConversionView
    Architectural walk-throughView

    Client Stories

    Hear From Our Clients

    Real projects, real results — straight from the people we've worked with.

    South Croxted Road · SE21Infill kitchen extension walkthrough
    Sunbury · CompleteFinished extension walkthrough
    Colwith Road · HammersmithRear extension & renovation

    How your project works

    Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.

    For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.

    1. Step 1: Initial Consultation & Feasibility

      Timeline: 1–3 days

      Initial consultation to discuss requirements, ideas and budget.

    2. Step 2: Architectural Design & Drawings

      Timeline: 1–4 weeks

      Architectural drawings and proposed layouts.

    3. Step 3: Planning Permission

      Timeline: 6–12 weeks (estimated)

      Planning application preparation and submission.

    4. Step 4: Structural Engineering & Building Regulations

      Timeline: 1–3 weeks, depending on complexity

      Structural calculations and drawings.

    5. Step 5: Contract & Building Works

      Timeline: Typically 4–20+ weeks, depending on project type

      Begin construction and manage all building works.

    6. Step 6: Completion & Handover

      Final client walkthrough and handover.

    All timelines are indicative. Your project-specific schedule is confirmed before construction.

    Our services

    Compliance Services

    LINX handles the certificates, assessments and remedial works that keep a building compliant: fire safety certificates and risk assessments, health and safety documentation such as CDM plans and RAMS, fire remedial works and building control — for residential and commercial properties across London and the South East.

    Assessment to sign-off

    Find It, Fix It, Certify It

    Compliance is rarely a single certificate. An assessment finds what needs attention; the remedial works put it right; and the paperwork shows it has been done. Because LINX is a builder as well as an assessor, one team can take you through all three.

    On our own projects the same thinking runs through the build: drawings prepared for Building Control, health and safety planned before work starts, and the certificates handed over at completion.

    • Fire risk assessments and certificates
    • CDM plans and RAMS
    • Fire stopping, fire doors and cladding remediation
    • Building Control drawings and liaison
    Stair landing with a sash window in a house renovated by LINX

    FAQs

    Common questions

    Ask us something else

    For workplaces, rented properties and the shared parts of blocks of flats, the law names a 'responsible person' — usually the employer, owner, landlord or managing agent — who must make sure a fire risk assessment is carried out and kept up to date. We carry out the assessment and any works it recommends.

    Get in touch

    Need a Certificate or an Assessment?

    Tell us about the property and what you need. We'll advise on the right assessment and give you a clear quotation.