
Architectural & Design Services
The detailed set Building Control approves and the site team builds from — structure, fire safety, insulation, drainage and accessibility, drawn by our in-house team.
Rated Excellent · 500+ reviews across Google Reviews, Reviews.io, TrustATrader and Houzz
Rear extension built by LINX
We'll be in touch shortly to discuss your requirements and suggest your first steps.
Six steps from first call to handover — see how your project works.
Our services
Ensuring compliance with building regulations is fundamental to the success of any construction endeavour.
Linx's building regulation drawing service provides comprehensive documentation meticulously tailored to meet regulatory standards.
From structural elements to fire safety measures and accessibility features, we meticulously detail every aspect to ensure seamless approvals.
A building regulation set goes further than planning drawings: it shows how the building is put together, so Building Control can approve it and our site team can build it without guesswork.
What's included
Drawn for approval, then used on site — the same sheets serve both.
From a LINX building-control set
Sheets from the 61 Cecile Park set, as submitted. Select a sheet to view it full size.
On site with LINX
The detail on a building regulation drawing is what the site team builds to — which is why we would rather draw it ourselves. Our designers and our trades work for the same company, so a question on site goes back to the person who drew the line.
Building Control inspections are coordinated by our project manager as the work goes up, through to final sign-off and your completion certificate.
How we deliver it
01
Initial compliance review and requirements analysis — what the regulations ask of your project.
02
Creating detailed regulatory compliance drawings, with structural calculations — typically 1–3 weeks, depending on complexity.
03
Submission and approval process with Building Control, with any queries answered by the people who drew the set.
04
The same drawings go to site, inspections are coordinated as the work goes up, and Building Control signs it off.
Planning drawings show what the building will look like and how it sits on its site. Building regulation drawings show how it will be built — structure, fire safety, insulation, drainage and accessibility — so Building Control can approve it.
Structural engineering and the building regulations package typically take 1–3 weeks, depending on how complex the project is.
Yes. Submission and approval are part of the service, and our project manager coordinates the inspections once work starts on site.
From £2,000. The exact fee depends on the size and complexity of the project and is confirmed after your consultation.
Get started today
Get your free, no-obligation quote today. Our experts are ready to bring your vision to life.