
Regulation
Plan checks, site inspections and final certification — we prepare the documentation and handle the liaison with approved inspectors or local authority Building Control.
We'll be in touch shortly to discuss your requirements and suggest your first steps.
Six steps from first call to handover — see how your project works.
Overview
Navigate the complex world of building regulations with our expert Building Control services. We prepare and submit all necessary documentation to ensure your project is fully compliant.
From initial plan checks to site inspections and final certification, we handle the liaison with approved inspectors or local authority building control to prevent costly delays and ensure legal compliance.
The drawings the inspector checks the work against are our own — plans, sections and construction details like the sheets on this page — so the submission and the build come from the same team.
Most delays come from work covered up before it has been inspected, or a drawing that no longer matches what was built. Both are avoided when the same team draws, submits and builds.
What's included
Everything between the drawings and the completion certificate, handled by the team doing the work.
The submission
Sections, construction details and window and door details from one of our own building-control sets. Select a sheet to view it full size.
From drawing to build
The ground floor plan our team drew for a new build office and warehouse unit, beside the LINX design visual of the same building.

How we deliver it
01
Building regulation drawings, specifications and structural calculations, prepared by our in-house team.
02
We submit to an approved inspector or the local authority and deal with their queries, so approval doesn't hold up the programme.
03
Our project manager coordinates each inspection with the works, so nothing is covered up before it has been seen.
04
Final inspection, Building Control sign-off and the completion certificate, handed over with the rest of your documents.
Related services
Work covered by the Building Regulations — structural alterations, new builds, extensions and many fit-outs — needs Building Control sign-off. We confirm what applies to your project at the free consultation.
Either. We handle the liaison with approved inspectors or local authority Building Control, whichever suits the project.
The building regulation drawings and documentation, with structural calculations where the work needs them — prepared by our own team.
After the final inspection, once the works are complete. We arrange it as part of handover, together with your other certificates and warranties.
Get started today
Get a free, no-obligation quote today. We’ll be in touch shortly to discuss your requirements and suggest your first steps.