Everything that happens before the superstructure — hoarding, demolition, groundworks, drainage and utilities — delivered as one package for developers and investors.
We'll be in touch shortly to discuss your requirements and suggest your first steps.
Six steps from first call to handover — see how your project works.
Overview
Enabling works that take a site from acquisition to a platform the main build can start from, delivered as one package for developers and investors.
Scope covers site establishment and hoarding, demolition, strip-out and clearance, excavation, groundworks, foundations, drainage, temporary works, structural alterations and steelwork, utility preparation, access works and construction logistics.
This is the stage where programmes are won or lost. Ground conditions, buried services and access constraints are the common causes of delay on a development, and all three are cheaper to find now than once the frame is going up.

What's included
Bought as one package rather than trade by trade, so one team owns the programme up to the start of the frame.
In pictures



How we deliver it
01
Ground conditions, buried services and access constraints are the common causes of delay — and all three are cheaper to find now than once the frame is going up.
02
Demolition, groundworks, foundations, drainage and temporary works under one programme and one fixed price.
03
A dedicated project manager and site foreman run hoarding, logistics and access, with daily updates and weekly reports.
04
We hand over a platform the main build can start from — and can carry on as main contractor if you want one team throughout.
Related services
FAQs
Everything between acquiring a site and starting the superstructure: site establishment and hoarding, demolition, clearance, excavation, groundworks, foundations, drainage, temporary works, structural alterations, utility preparation, access and logistics.
Because it is where programmes are won or lost. Ground conditions, buried services and access constraints are the usual causes of delay on a development, and they are far cheaper to deal with now.
Yes. LINX acts as main contractor on residential and commercial developments across London and the South East, so the team that prepared the site can go on to build on it.
Yes. Our architectural team provides drainage CCTV surveys and drainage designs, so the below-ground work is drawn before it is dug.