LINX acts as main contractor on residential and commercial developments across London and the South East, taking single-point responsibility from pre-construction through to practical completion and the defects period.
Pre-construction support covers feasibility input, budget costing, cost planning, tendering, design development and value engineering. On site we hold programme, procurement, subcontractor management and the coordination of Building Control, structural, M&E and utilities — through testing, commissioning, snagging and handover.
We work under traditional, design and build, and construction management arrangements, and are comfortable being brought in early to shape buildability before the drawings are fixed.
For a developer that means one programme, one line of reporting and one team accountable for quality — a dedicated project manager and site foreman, daily updates and weekly progress reports from mobilisation to handover.

What's included
One contractor accountable for the whole job, so the questions that fall between consultants have someone to land on.
In pictures

How we deliver it
01
Feasibility input, budget costing, cost planning and value engineering — shaping buildability before the drawings are fixed.
02
Programme, procurement and subcontractor packages agreed and placed, with a dedicated project manager and site foreman.
03
We coordinate Building Control, structural, M&E and utilities, with daily updates and weekly progress reports.
04
Testing, commissioning, snagging and handover — then the defects period and our 10-year structural guarantee.
Related services
FAQs
One contractor accountable from pre-construction through to practical completion and the defects period — programme, procurement, subcontractors and the coordination of every consultant and utility.
Traditional, design and build, and construction management arrangements.
Yes, and it is often the most useful time. Early involvement lets us shape buildability, cost and programme through value engineering before the design is locked.
Yes. That coordination is part of the main contractor role, carried through testing, commissioning, snagging and handover.