How to Choose the Right Architect for Your Home Project
Check the register, compare fees like for like, and know which stages you're paying for. A homeowner's guide to hiring the right architect.
28 November 20269 min readBy LINX Design and Build

Most homeowners choose an architect the way they'd choose a restaurant: nice photos, a friend's recommendation, a good first impression. Then, months later, they discover the fee only covered planning drawings, nobody priced the design before submitting it, and the builder's quote is far above budget. The drawings looked beautiful. The appointment was the problem. Here's how to choose well, what to check, and the questions that separate a good fit from an expensive one.
Key Takeaways
- "Architect" is a protected title in the UK, so check the register before you hire anyone using it.
- Pick someone who has built projects like yours, on houses like yours, not just someone with a striking portfolio.
- A fee only means something once you know which stages of work it covers.
- Agree the scope and the fee in writing before any work starts.
- Talk about your real budget early. A design you can't afford to build isn't a good design.
Do You Actually Need an Architect?
Not always. It's an awkward thing to read in a guide about hiring one, but the right professional depends on the job. A straightforward loft conversion on a typical terrace asks for different skills than gutting a listed townhouse or building a new home on a sloping plot.
Here are the routes most homeowners weigh up.
| Who you hire | What to know | Often suits |
|---|---|---|
| Registered architect | Protected title, regulated by the Architects Registration Board | Complex, design-led, heritage or new-build work |
| Chartered architectural technologist | Chartered through their own institute, with a technical focus | Detailed construction drawings and building regulations |
| Architectural designer | Not a protected title, so experience varies widely | Simpler schemes, once you've checked their track record |
| Design and build company | Design and construction under one contract | Homeowners who want one team accountable for cost and delivery |
None of these is automatically better. An independent architect gives you a design adviser who sits apart from the builder. A design and build team gives you pricing and buildability while the drawings are still easy to change. Decide which of those matters more to you before you start collecting names.
Write a One-Page Brief Before You Call Anyone
Three conversations with three architects are impossible to compare if you describe your project differently each time. So write it down first. One page is plenty.
- The problem, not the solution. "We can't eat together and the garden feels cut off" is more useful than "we want a rear extension".
- Your total budget, including VAT, professional fees, surveys, fittings and contingency.
- Must-haves and nice-to-haves, kept in two separate lists.
- Timing, including any fixed date such as a school move or the end of a tenancy.
- Known constraints: listed status, conservation area, shared walls, drains, trees or restricted access.
If you're unsure what is realistic, start with typical local build costs and work backwards. A good architect will tell you early when the wish list and the budget don't match. A less helpful one will design everything you asked for and let the builders deliver the bad news.
Check the Register Before You Check the Portfolio
In the UK, only people on the Architects Register can call themselves an architect in business or practice. Related terms such as "architectural designer" or "architectural consultant" aren't protected in the same way. That doesn't make those people poor at their job. It does mean you have to do more checking yourself.
The Architects Registration Board explains what to look for in its guidance on what to check before hiring an architect. Search the register, ask for the person's registration number, and confirm who will actually be working on your home. The name on the practice website may not be the person drawing your plans.
You'll also see "RIBA" and "Chartered Practice" a lot. Membership of the Royal Institute of British Architects is voluntary and separate from registration. It can be a useful extra signal, but it isn't a substitute for the register check. Ask about professional indemnity insurance too. Registered architects are expected to be adequately insured, and it's perfectly reasonable to ask for evidence.
Read a Portfolio Like a Sceptic
Computer renders are persuasive. They're also not buildings. When you look through someone's work, ask which images show finished projects and which show proposals.
Then look for relevance. Has this person worked on a house of your age and type? A Victorian terrace, a 1930s semi and a detached house in the green belt each bring their own structural habits and planning sensitivities. Someone who has solved your kind of problem before will usually spot the awkward bit in the first visit.


Ask past clients better questions
"Were you happy?" gets you a polite yes. Try these instead:
- How close was the final build cost to the figure discussed at concept stage?
- What went wrong, and how did they handle it?
- How quickly did they reply once the novelty had worn off?
- Would you give them the same scope again, or more, or less?
Questions to Ask at the First Meeting
The first meeting is an interview in both directions. Notice what they ask you. An architect who wants to know how your mornings work, who cooks, and what annoys you about the house is gathering design information. One who starts sketching before listening may be designing for their own portfolio.
- What have you completed that is closest to our project, and can we speak to that client?
- Who will be our day-to-day contact?
- What do you think our budget will realistically buy?
- Is this likely to be permitted development, or will it need planning permission?
- When will the design be priced, and what happens if it comes in over budget?
- How many design options and revisions are included?
- What is your current workload, and when could you start?
- Which other consultants will we need, and who coordinates them?
Pay particular attention to the budget answer. And be wary of anyone who promises planning approval. The decision belongs to the local authority, so no architect can guarantee it.
How Architect Fees Work
Fees usually come in one of three forms, and sometimes a mix.
- Percentage of build cost. Common on larger or full-service projects. The fee moves as the build cost moves.
- Fixed fee. Often used for defined stages, such as a planning drawings package. Clear, provided the scope is clear.
- Hourly or day rate. Useful for early advice. Ask for a cap.
Published guides quote percentages anywhere from low single figures to the mid-teens. A spread that wide tells you something: a percentage on its own says very little. A low quote that stops at planning and a higher quote that runs to completion aren't competing offers. They're different products.
Put every quote into the same grid. What's included? What's extra? Is VAT shown? How are changes charged? When is each payment due?
Remember the costs that sit outside the fee, such as measured surveys, structural engineering, building control and the council's planning application charge. In England, a householder application for a single home costs £548 under the rates that began on 1 April 2026, rising to £575 from 8 December 2026. Check the government's current planning application fee schedules before you budget, because they change.
Know Which Stages You're Paying For
This is where many appointments quietly go wrong. UK architects commonly describe their work using the RIBA Plan of Work, which splits a project into stages numbered 0 to 7. You don't need to memorise it. You do need to know where your fee starts and stops.
| RIBA stage | What it means for a homeowner |
|---|---|
| 0–1: Strategic definition, preparation and briefing | Is building the right answer? Brief, budget, surveys and early feasibility. |
| 2: Concept design | Layout options, massing and a first cost check. |
| 3: Spatial coordination | The developed design, usually the basis of a planning application. |
| 4: Technical design | Construction details, specification and building regulations information. |
| 5: Manufacturing and construction | The build itself, including site queries and, if agreed, contract administration. |
| 6–7: Handover and use | Snagging, completion paperwork and living with the result. |
Say you accept a quote that ends at stage 3. You may get planning permission and still have nothing detailed enough for a builder to price accurately. That's fine if you planned for it. It's a nasty surprise if you didn't. Ask who produces the stage 4 information and who answers questions once walls start coming down.
Ask Who Holds the Safety and Compliance Duties
Few homeowners ask this. Building work carries legal duties under health and safety law (the CDM Regulations) and under the building regulations. Where more than one contractor is involved, someone needs to act as principal designer and someone as principal contractor.
As a domestic client, much of the burden doesn't sit with you in the way it would with a business. Still, you should know the names. Ask each candidate whether they'll take on the principal designer role, whether they're competent to do it, and whether it's included in the fee. A confident, specific answer is a good sign.
Get the Appointment in Writing
The fee level should be agreed in writing before work begins, and later changes to scope or cost should be confirmed in writing too. A friendly email chain that leaves things open isn't enough. Your appointment document should cover:
- The services and stages included, and the ones that aren't.
- The fee, payment points and rates for extra work.
- Who owns the drawings and who may use them to build.
- Insurance details.
- How either side can pause or end the appointment.
- How complaints and disputes will be handled.
Pay special attention to the drawings clause. If you might hand the design to a different team after planning, you need to know now whether you can.
Why Local Knowledge Matters
Planning policy is applied by local authorities, and their expectations differ. Roof extensions that are routine on one street can be refused a few postcodes away. Ask whether the architect has submitted applications to your council and what they learned from them.
In the capital, you'll often be dealing with conservation areas, tight access and neighbours on both sides. A team familiar with home extensions and renovations across London should raise those issues before they affect your programme. Shared walls are a good test. If your architect doesn't mention notices early on, read our guide to party wall agreements for London homeowners and bring it up yourself.

Red Flags Worth Taking Seriously
- They use the title "architect" but you can't find them on the register.
- They won't put the scope and fee in writing.
- Budget questions get brushed aside until after planning.
- Planning approval is "guaranteed".
- You can't speak to a single past client.
- You leave meetings feeling talked over.
That last one counts. You could be working with this person for a year or more, often while making stressful money decisions. Trust and plain speaking matter as much as design flair.
Frequently Asked Questions
How many architects should I speak to?
Three is a sensible number for most home projects. It's enough to compare approaches and fees without turning the search into a second job. Give each one the same brief.
When should I hire an architect?
Early, ideally before you've fixed on a solution. The cheapest time to change a design is while it's still lines on a page. Early involvement can also reveal that you need less new space than you thought.
Can I use one firm for design and another for construction?
Yes. This is the traditional route, and it gives you independent design advice. You'll manage two relationships, though, so be clear about who resolves a conflict between drawings and site conditions.
Do I need planning permission for my extension?
It depends on the size, position and history of your home. Many projects fall within permitted development, but rights can be restricted in conservation areas, on flats and on some newer estates. Listed buildings have separate consent rules. Confirm your position before you commit to a design.
What should I bring to the first meeting?
Your one-page brief, any existing drawings, a few images of spaces you like (and some you don't), and an honest budget figure.
Talk Through Your Project Before You Commit
Choosing an architect gets much easier once you know what you need, what you can spend and who will be responsible at each stage. If you'd like architectural design and construction handled by one team, contact LINX to book a free consultation. Bring your brief, and ask us every question on this page.