The project
This project involved a full loft conversion alongside a rear extension at a residential property in Wimbledon, SW18, designed to significantly increase both internal living space and overall property value. The brief focused on expanding the home while maintaining architectural consistency with neighbouring properties, ensuring the new works blended naturally with the existing structure. Careful planning of layouts and volumes allowed the additional space to feel cohesive, well-balanced, and integrated into the original home.
LINX Design and Build delivered the project on a fully managed design and build basis, overseeing all structural alterations, steel installation, and construction works. Traditional London stock brickwork and slate roof tiles were selected to match the existing façade and roofline, providing durability and visual continuity. Electrical, plumbing, heating, insulation, and internal finishes were completed to a high standard, with full building control compliance and final sign-off achieved. Delivered over a 20-week programme, the completed loft conversion and extension provide a high-quality, long-lasting upgrade consistent with Wimbledon residential standards.
Gallery
12 photographs from this project. Select any one to see it full size.
Client review
“Outstanding workmanship. Kept us informed every step of the way.”
The service
Master suites, home offices and extra bedrooms — unused roof space turned into the best room in the house, with Velux, dormer, hip-to-gable, L-shaped and mansard conversions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Project value
£160,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other loft conversions we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
LINX delivered a full loft conversion and a rear extension at a home in Wimbledon, SW18, on a fully managed design and build basis, including the structural alterations and steel installation.
The project was delivered over a 20-week programme.
The loft conversion and rear extension in Wimbledon had a project value of £160,000.
The brief was to keep the architecture consistent with neighbouring properties, so traditional London stock brick and slate roof tiles were chosen to match the existing facade and roofline.
Yes. The work achieved full building control compliance and final sign-off, with the electrics, plumbing, heating, insulation and internal finishes completed as part of the project.