Manor Park Road, London

The project
This stunning loft conversion at Blenheim Terrace transformed unused attic space into a bright, functional living area. Linx Design Build created beautiful loft bedrooms with bespoke joinery, maximizing every inch of space under the eaves with clever storage solutions including fitted wardrobes and custom shelving.
The project features multiple skylights that flood the space with natural light, creating an airy and welcoming atmosphere. With careful attention to detail in the carpentry and finishing, this loft conversion has added significant value to the property while providing versatile, high-quality living space for the family.
Gallery
7 photographs from this project. Select any one to see it full size.
The service
Master suites, home offices and extra bedrooms — unused roof space turned into the best room in the house, with Velux, dormer, hip-to-gable, L-shaped and mansard conversions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.
Starting price
From £55,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.