
Blenheim Terrace, London

The project
This expertly executed loft conversion in Barnet transformed previously unused attic space into a beautiful and functional living area. The project involved structural modifications, including the installation of roof windows and reinforced flooring, to create a bright and spacious additional room that seamlessly integrates with the existing home.
Our team managed all aspects of the conversion, from initial structural work and building regulations compliance through to the finishing touches. The result is a stunning loft space featuring quality fixtures, excellent natural lighting, and thoughtful design details that maximize both functionality and aesthetics, adding significant value to the property.
Gallery
6 photographs from this project. Select any one to see it full size.
The service
Master suites, home offices and extra bedrooms — unused roof space turned into the best room in the house, with Velux, dormer, hip-to-gable, L-shaped and mansard conversions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Project value
£65,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other loft conversions we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
It turned previously unused attic space in a Barnet home into a bright, spacious additional room that integrates with the rest of the house.
The project involved structural modifications, including the installation of roof windows and reinforced flooring, to create the new room.
Yes. The LINX team managed every aspect of the conversion, from the initial structural work and building regulations compliance through to the finishing touches.
The Barnet loft conversion was a £65,000 project, dating from 2017.
Yes. LINX loft conversions start from £55,000, including Velux, dormer, hip-to-gable, L-shaped and mansard conversions across London and the South East. Call 020 8914 7824 for a free consultation.