CallWhatsAppGet a Quote
    Complete Renovation in Wheler Street — photo 1

    Complete Renovation — Wheler Street, London

    Project
    Complete Renovation
    Location
    London
    Project value
    £150,000
    Year
    2024

    The project

    About this project

    Linx Design Build completed a full renovation project for the customers at Wheler Street. This included kitchen, bathroom, furnishings and all aspects of the interior to completely renovate and modernise Wheler Street. Fitted wardrobes, beautifully tiled and walk in shower with floating toilet, carved marble sink, overhead shower and all electrics and plumbing completed by Linx.

    Bedrooms, living room, office, bathroom, kitchen and external aesthetics really set this property apart.

    Gallery

    The project in pictures

    7 photographs from this project. Select any one to see it full size.

    The service

    Home renovations

    Whole-house renovations and refurbishments across London & the South East — calmer, brighter, more beautiful living without moving house.

    One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.

    Starting price

    From £40,000

    Typical build times

    • Full house renovation8–20+ weeks
    • Kitchen renovation2–5 weeks
    • Bathroom renovation2–4 weeks

    These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.

    What every client receives

    • JCT Construction Contract
    • Payment Plan
    • Construction Programme
    • Dedicated Full-Time Project Manager
    • Dedicated Full-Time Site Foreman
    • Daily Progress Updates
    • Weekly Progress Reports
    • Quality Control
    • Completion & Handover

    How your project works

    Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.

    For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.

    1. Step 1: Initial Consultation & Feasibility

      Timeline: 1–3 days

      Initial consultation to discuss requirements, ideas and budget.

    2. Step 2: Architectural Design & Drawings

      Timeline: 1–4 weeks

      Architectural drawings and proposed layouts.

    3. Step 3: Planning Permission

      Timeline: 6–12 weeks (estimated)

      Planning application preparation and submission.

    4. Step 4: Structural Engineering & Building Regulations

      Timeline: 1–3 weeks, depending on complexity

      Structural calculations and drawings.

    5. Step 5: Contract & Building Works

      Timeline: Typically 4–20+ weeks, depending on project type

      Begin construction and manage all building works.

    6. Step 6: Completion & Handover

      Final client walkthrough and handover.

    All timelines are indicative. Your project-specific schedule is confirmed before construction.

    Get a similar result

    Tell us about your project and we will come back with a fixed-price quote within 24 hours.