
Wallington, SM6

The project
LINX Design & Build completed this rear extension project in Vitali Close, SW15, creating a larger, brighter and more practical living space with a strong connection to the garden.
The client's objective was to increase the usable ground-floor space while introducing a modern architectural finish. The project incorporated a metal roof, large bi-fold doors and a fully tiled floor, resulting in a contemporary extension designed for everyday family living. The complete project had a value of £65,000 including VAT and was delivered over a 6-week construction programme.
Rear Extension — the main element of the project was the construction of the new rear extension. Our team managed the building works from the structural stages through to completion, coordinating the different trades required to create the finished space. The extension significantly increased the ground-floor living area and provided the homeowners with a more open and versatile environment.
Metal Roof — a key architectural feature of the extension was the metal roof, giving the new structure a clean, modern appearance. The contemporary roof design helped distinguish the extension while complementing the overall character of the property.
Bi-Fold Doors — large bi-fold doors were installed across the rear of the extension, allowing the internal space to open directly onto the garden. The extensive glazing brings additional natural light into the property and creates a much stronger visual and physical connection between the home and the outdoor space.
Tiled Flooring & Internal Finishes — the new extension was finished with tiled flooring, providing a practical, durable and modern finish suitable for a high-use family living area. Our team coordinated the internal works and finishing elements to ensure the completed extension felt like a natural continuation of the existing home rather than a separate addition.
The Result — completed in approximately 6 weeks, the project transformed the rear of the property and provided the homeowners with valuable additional living space. The combination of the modern metal roof, expansive bi-fold doors and tiled interior created a bright, contemporary extension with excellent access to the garden.
Project at a glance — Location: Vitali Close, London, SW15 5EX. Project value: £65,000 including VAT. Duration: 6 weeks. Works: Rear Extension • Metal Roof • Bi-Fold Doors • Tiled Flooring • Internal Finishing Works.
Gallery
16 photographs from this project. Select any one to see it full size.
Film
The service
Rear, side return, wraparound, double-storey and kitchen extensions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.
Starting price
From £60,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home extensions we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.