
South Croxted Road, SE21

The project
This home extension project transformed our client's property by adding a spacious, light-filled rear addition that seamlessly blended with the existing architecture. The brief was to create an open-plan kitchen and dining area that would become the heart of the home, perfect for family gatherings and entertaining guests. We maximised natural light through large bi-fold doors and skylights, creating a bright, welcoming space that connects effortlessly to the garden.
From initial design concepts to the final finishing touches, our team handled every stage of the build with precision and care. High-quality materials, modern energy-efficient glazing, and meticulous craftsmanship ensured a durable and stylish extension. The result was a functional yet beautiful space that enhanced the home's value and provided the client with an inspiring environment to enjoy for years to come.
Gallery
6 photographs from this project. Select any one to see it full size.
The service
Rear, side return, wraparound, double-storey and kitchen extensions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.
Starting price
From £60,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home extensions we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.