Wheler Street, London

The project
A complete home transformation project at Tavistock Road, where Linx Design Build modernised every aspect of this property. The project included a full interior renovation with contemporary kitchen installation, luxurious bathroom upgrades, and high-quality finishes throughout all living spaces.
From new flooring and lighting design to fitted wardrobes and decorative elements, every detail was meticulously planned and executed. The transformation showcases our commitment to creating beautiful, functional spaces that enhance our clients' daily living experience while adding substantial value to their property.
Gallery
8 photographs from this project. Select any one to see it full size.
The service
Whole-house renovations and refurbishments across London & the South East — calmer, brighter, more beautiful living without moving house.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Project value
£165,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home renovations we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
LINX carried out a complete home renovation at Tavistock Road in London, modernising every part of the property.
The work included a contemporary kitchen, upgraded bathrooms, new flooring, lighting design, fitted wardrobes and high-quality finishes throughout the living spaces.
The complete home renovation at Tavistock Road had a value of £165,000.
LINX uses a payment plan with structured payments tied to agreed project milestones, set out alongside a JCT construction contract.
LINX gives an indicative build time of 8 to 20 or more weeks for a full house renovation, depending on scope, site conditions and approvals. Your own programme is confirmed before construction starts.