Stamford House, London

The project
This comprehensive renovation project on Spanby Road showcases our commitment to transforming traditional homes into modern living spaces. The project included a complete overhaul of the interior spaces, featuring contemporary design elements that blend seamlessly with the property's character.
From custom fitted kitchens with premium appliances to luxurious bathroom installations with modern fixtures, every detail was carefully considered. The renovation also included new flooring, lighting design, and decorative finishes throughout, creating a cohesive and sophisticated living environment that our clients can enjoy for years to come.
Gallery
7 photographs from this project. Select any one to see it full size.
The service
Whole-house renovations and refurbishments across London & the South East — calmer, brighter, more beautiful living without moving house.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.
Starting price
From £40,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.