
Coldbath, London

The project
A complete refurbishment of a 2-bedroom flat in Cloakhouse, transforming it into a modern and stylish living space. The project involved comprehensive interior renovations throughout the property.
The refurbishment included a complete redesign of the kitchen and bathrooms, with high-quality fixtures and contemporary finishes. New flooring, lighting, and decoration were installed throughout, creating bright and inviting living spaces.
Attention to detail and quality craftsmanship ensured a premium finish that maximized the potential of the compact space while maintaining functionality.
Gallery
8 photographs from this project. Select any one to see it full size.
The service
Whole-house renovations and refurbishments across London & the South East — calmer, brighter, more beautiful living without moving house.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Project value
£75,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home renovations we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
A two-bedroom flat in London, which LINX refurbished throughout to create a modern and stylish living space.
A complete redesign of the kitchen and bathrooms with high-quality fixtures and contemporary finishes, plus new flooring, lighting and decoration throughout.
Careful detailing and quality craftsmanship gave a premium finish that makes the most of the compact space while keeping it practical to live in.
The Cloakhouse project had a value of £75,000.
Yes. LINX home renovations start from £40,000, on a fixed-price quote. Call 020 8914 7824 to arrange a free consultation and site visit.