
Holbrook Road, London

The project
Linx Design Build undertook a comprehensive transformation of this Hedgley Street property, delivering exceptional quality across every aspect of the renovation. From sophisticated kitchen installations to luxurious bathroom designs, the project showcases our expertise in creating modern, functional living spaces that exceed client expectations.
The project included bespoke joinery work, premium fixtures and fittings, contemporary tiling throughout, complete electrical and plumbing installations, and beautiful decorative finishes. Every detail was carefully planned and executed to the highest standards, resulting in a stunning property that perfectly balances style with functionality.
Gallery
8 photographs from this project. Select any one to see it full size.
The service
Whole-house renovations and refurbishments across London & the South East — calmer, brighter, more beautiful living without moving house.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Project value
£165,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home renovations we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
A comprehensive transformation of the property, with new kitchen installations, bathroom designs, bespoke joinery and contemporary tiling throughout.
Yes. Complete electrical and plumbing installations were part of the scope, along with premium fixtures and fittings.
With bespoke joinery, contemporary tiling and decorative finishes, each detail planned to balance style with everyday practicality.
The Hedgley Street renovation had a value of £165,000.
LINX home renovations start from £40,000, on a fixed-price quote with a site visit. Book a free consultation on 020 8914 7824.