
Lyme Road, London

The project
This comprehensive renovation at Holbrook Road transformed both the kitchen and bathroom spaces, creating modern, functional areas that blend contemporary design with practical living. Linx Design Build delivered a complete kitchen remodel featuring high-end appliances, bespoke cabinetry, and premium finishes throughout.
The bathroom renovation showcased meticulous attention to detail with luxury fixtures, elegant tiling, and thoughtful space planning. Both spaces now offer a perfect balance of style and functionality, significantly enhancing the property's appeal and value while providing the homeowners with beautiful, practical living spaces.
Gallery
7 photographs from this project. Select any one to see it full size.
The service
Whole-house renovations and refurbishments across London & the South East — calmer, brighter, more beautiful living without moving house.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Project value
£125,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home renovations we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
Both the kitchen and the bathroom were renovated, creating modern, practical spaces in this London home.
LINX delivered a complete kitchen remodel with high-end appliances, bespoke cabinetry and premium finishes throughout.
With luxury fixtures, elegant tiling and careful space planning.
The Holbrook Road project had a value of £125,000.
Yes. LINX home renovations start from £40,000 and come with a fixed-price quote. Call 020 8914 7824 to book a free consultation.