Morel Mews, London

The project
A comprehensive loft conversion and renovation project at Montrose Avenue, transforming unused attic space into a beautiful and functional living area. This project included structural modifications, new stairs, insulation, and complete interior finishing to create a stunning additional bedroom with en-suite bathroom.
The renovation extended throughout the property, modernising the kitchen, bathrooms, and living spaces with high-quality materials and contemporary design. Every detail was carefully executed by Linx Design Build to enhance the property's value and provide the clients with a sophisticated, cohesive living environment.
Gallery
38 photographs from this project. Select any one to see it full size.
The service
Master suites, home offices and extra bedrooms — unused roof space turned into the best room in the house, with Velux, dormer, hip-to-gable, L-shaped and mansard conversions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.
Starting price
From £55,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.