
Brondesbury Road, London

The project
A comprehensive kitchen infill extension and internal renovation, designed to create a brighter, more spacious and more functional living environment. The project extended the existing kitchen, brought in a great deal more natural light, and upgraded key areas of the property with modern finishes and practical design features.
The infill extension increased the usable kitchen space, with electrically operated rooflights positioned to maximise daylight through the middle of the plan and new uPVC French doors opening the room to the garden. A complete fitted kitchen was installed, along with new flooring throughout the renovated areas and a bespoke arched pocket door leading through to the utility.
Upstairs, the first-floor bathroom was fully refurbished. The project completed in 10 weeks at a total value of £95,000 including VAT, delivering a modern kitchen extension with improved natural light, better flow and beautifully upgraded interior spaces.
Gallery
10 photographs from this project. Select any one to see it full size.
Film
The service
Rear, side return, wraparound, double-storey and kitchen extensions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.
Starting price
From £60,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home extensions we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.