    Infill Kitchen Extension & Renovation — South Croxted Road, SE21

    Project
    Infill Kitchen Extension & Renovation
    Location
    South Croxted Road, London SE21 8AX
    Project value
    £95,000
    Duration
    10 weeks
    Year
    2026

    The project

    About this project

    A comprehensive kitchen infill extension and internal renovation, designed to create a brighter, more spacious and more functional living environment. The project extended the existing kitchen, brought in a great deal more natural light, and upgraded key areas of the property with modern finishes and practical design features.

    The infill extension increased the usable kitchen space, with electrically operated rooflights positioned to maximise daylight through the middle of the plan and new uPVC French doors opening the room to the garden. A complete fitted kitchen was installed, along with new flooring throughout the renovated areas and a bespoke arched pocket door leading through to the utility.

    Upstairs, the first-floor bathroom was fully refurbished. The project completed in 10 weeks at a total value of £95,000 including VAT, delivering a modern kitchen extension with improved natural light, better flow and beautifully upgraded interior spaces.

    Gallery

    The project in pictures

    10 photographs from this project. Select any one to see it full size.

    Film

    The project on film

    South Croxted Road · SE21Infill kitchen extension — from the air and on site
    South Croxted Road · SE21Infill kitchen extension walkthrough

    The service

    Home extensions

    Rear, side return, wraparound, double-storey and kitchen extensions across London & the South East.

    One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a 10-year structural guarantee and a free consultation to start.

    Starting price

    From £60,000

    Typical build times

    • Single-storey extension8–12 weeks
    • Double-storey extension12–18 weeks
    • Kitchen extension8–12 weeks
    • Side return extension8–12 weeks
    • Wraparound extension12–18 weeks

    These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.

    What every client receives

    • JCT Construction Contract
    • Payment Plan
    • Construction Programme
    • Dedicated Full-Time Project Manager
    • Dedicated Full-Time Site Foreman
    • Daily Progress Updates
    • Weekly Progress Reports
    • Quality Control
    • Completion & Handover

    How your project works

    Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.

    For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.

    1. Step 1: Initial Consultation & Feasibility

      Timeline: 1–3 days

      Initial consultation to discuss requirements, ideas and budget.

    2. Step 2: Architectural Design & Drawings

      Timeline: 1–4 weeks

      Architectural drawings and proposed layouts.

    3. Step 3: Planning Permission

      Timeline: 6–12 weeks (estimated)

      Planning application preparation and submission.

    4. Step 4: Structural Engineering & Building Regulations

      Timeline: 1–3 weeks, depending on complexity

      Structural calculations and drawings.

    5. Step 5: Contract & Building Works

      Timeline: Typically 4–20+ weeks, depending on project type

      Begin construction and manage all building works.

    6. Step 6: Completion & Handover

      Final client walkthrough and handover.

    All timelines are indicative. Your project-specific schedule is confirmed before construction.