
Standen Road, Earlsfield, SW18

The project
This exceptional outbuilding project in Romford transformed an underutilized garden space into a stunning multi-purpose structure. The building features a contemporary brick exterior with rosewood bi-fold doors that create a beautiful connection between indoor and outdoor spaces. Set on a pristine artificial grass lawn, the outbuilding provides versatile space perfect for use as a home office, gym, studio, or guest accommodation.
The interior showcases bright, modern finishes with light grey luxury vinyl tile flooring, crisp white walls, and elegant traditional brass light fittings throughout. The space includes multiple well-appointed rooms with mahogany French doors providing garden access, along with a fully fitted bathroom featuring modern fixtures and stylish glass shelving. Quality craftsmanship is evident in every detail, from the clean lines to the professional finishes.
Gallery
6 photographs from this project. Select any one to see it full size.
The service
Rear, side return, wraparound, double-storey and kitchen extensions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Project value
£85,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home extensions we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
LINX built a multi-purpose garden outbuilding in Romford, Essex, turning an underused part of the garden into a brick-built structure. It works as a home office, gym, studio or guest accommodation.
It has a contemporary brick exterior with rosewood bi-fold doors and mahogany French doors to the garden, set on an artificial grass lawn. Inside there are several rooms with light grey luxury vinyl tile flooring, white walls and traditional brass light fittings.
Yes. It includes a fully fitted bathroom with modern fixtures and glass shelving.
The Romford project value was £85,000. LINX garden rooms and outbuildings start from £5,000, and the cost depends on the size and specification of the building.
Yes. Romford is in Essex, and LINX works across London and the South East. Book a free consultation on 020 8914 7824 to discuss your garden.