
Romford, London

Design concept — CGI visualisation
The proposal
Design concept — CGI visualisation. Every image on this page is a computer-generated visualisation of a design proposal, not a photograph of a completed LINX build.
A design concept for a contemporary side return extension to an Edwardian semi in Richmond, opening a dark galley kitchen into a bright, sociable family hub.
The brief it answers is simple: more light, more space and a better connection to the garden. The proposed structure has a flat roof with two large rooflights, three-metre aluminium sliding doors and a pitched zinc-clad detail to the side wall.
Inside, the kitchen, dining and family area flows under a single ceiling line, with underfloor heating, polished concrete floors and crisp white walls for a calm, modern feel.
Gallery
11 CGI visualisations of the proposal. Select any one to see it full size.
The service
Rear, side return, wraparound, double-storey and kitchen extensions across London & the South East.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Starting price
From £60,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home extensions we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
No, it is a design concept. The images are computer-generated visualisations of a proposal for an Edwardian semi in Richmond, TW10.
The brief is more light, more space and a better connection to the garden, opening a dark galley kitchen into a bright, sociable family hub.
The proposed structure has a flat roof with two large rooflights, three-metre aluminium sliding doors and a pitched zinc-clad detail to the side wall.
The kitchen, dining and family areas flow under a single ceiling line, with underfloor heating, polished concrete floors and crisp white walls for a calm, modern feel.
LINX home extensions start from £60,000, and the final price of a side return depends on its size and specification. A free consultation on 020 8914 7824 leads to a fixed-price quote.