
Sotheby Road, London

Design concept — CGI visualisation
The proposal
Design concept — CGI visualisation. Every image on this page is a computer-generated visualisation of a design proposal, not a photograph of a completed LINX build.
A design concept for a three-bedroom new build mews house on a tight corner plot in Hampstead, where the challenge is maximising space and light on a footprint of just 78 square metres.
The design uses a glazed, top-lit central core, smart split levels and a basement floor to create a feeling of generosity that defies the modest footprint.
Materials — brick, oak and brushed brass – are deliberately limited and used consistently throughout to give the home a calm, considered atmosphere.
Gallery
4 CGI visualisations of the proposal. Select any one to see it full size.
The service
New build homes across London & the South East — houses, flats, apartment blocks, penthouses and mixed-use developments, turnkey from groundworks to handover.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Starting price
From £160,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
More completed LINX projects.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
No. Hampstead Mews is a design concept, and the images on the page are CGI visualisations of the proposal rather than photographs of a built home.
It is a tight corner plot, so the design has to make the most of space and light for a three-bedroom house on a footprint of just 78 square metres.
It uses a glazed, top-lit central core, smart split levels and a basement floor to create a sense of space beyond the modest footprint.
Brick, oak and brushed brass, deliberately limited and used consistently throughout to give the home a calm, considered atmosphere.
Yes. Our in-house architects handle the design and our new build service takes the home from groundworks to handover, starting from £160,000. Call 020 8914 7824 to discuss your site at a free consultation.