
Lyme Road, London

Design concept — CGI visualisation
The proposal
Design concept — CGI visualisation. Every image on this page is a computer-generated visualisation of a design proposal, not a photograph of a completed LINX build.
A design concept for the renovation of a Victorian mews property in Kensington, showing how the building's original character could be kept while a thoroughly modern interior with high-end finishes is introduced throughout.
The proposal restores the original cornicing, fireplaces and timber sash windows, then re-plans the ground floor as an open-plan kitchen, dining and living space lit by a new glazed rear wall.
Bespoke joinery, polished plaster walls, engineered oak floors and a hand-built kitchen complete the scheme.
Gallery
11 CGI visualisations of the proposal. Select any one to see it full size.
The service
Whole-house renovations and refurbishments across London & the South East — calmer, brighter, more beautiful living without moving house.
One team takes it from the first drawing to handover — our in-house architects and our own trades — on a fixed-price quote, with a workmanship guarantee and a free consultation to start.
Starting price
From £40,000
Typical build times
These are indicative construction durations only. Final programmes depend on project scope, site conditions, approvals and material availability.
What every client receives
Six clear stages, from first enquiry to completion — whether we design and build, or build from your drawings.
For clients who need the whole project managed: design, planning, building regulations and construction, from initial enquiry through to completion.
Timeline: 1–3 days
Initial consultation to discuss requirements, ideas and budget.
Timeline: 1–4 weeks
Architectural drawings and proposed layouts.
Timeline: 6–12 weeks (estimated)
Planning application preparation and submission.
Timeline: 1–3 weeks, depending on complexity
Structural calculations and drawings.
Timeline: Typically 4–20+ weeks, depending on project type
Begin construction and manage all building works.
Final client walkthrough and handover.
For clients who already have architectural drawings and require a construction contractor.
Timeline: 1 day
Upload architectural and structural drawings.
Timeline: 1–3 days
Site inspection and measurements.
Timeline: 1–5 working days
Labour, materials and project specifications.
Timeline: 1–5 working days following agreement, subject to readiness
Agree the final quotation and sign the JCT contract.
Timeline: Typically 4–20+ weeks, depending on project type
Full construction management and quality control.
Final handover to the customer.
All timelines are indicative. Your project-specific schedule is confirmed before construction.
More of our work
Other home renovations we have completed.
Tell us about your project and we will come back with a fixed-price quote within 24 hours.
No. It is a design concept for a Victorian mews property in Kensington, W8, and all the images are CGI visualisations of the proposal.
The proposal restores the original cornicing, fireplaces and timber sash windows, keeping the building's character while introducing a modern interior.
It is re-planned as an open-plan kitchen, dining and living space, lit by a new glazed rear wall.
Bespoke joinery, polished plaster walls, engineered oak floors and a hand-built kitchen.
Our in-house architects and our own trades can take a period renovation from design to handover on a fixed-price quote. LINX home renovations start from £40,000, and a free consultation on 020 8914 7824 is the first step.